State Route 65/North Grand Ave Project Study Report
Porterville, CA

Prepared the "Fast-Track" Project Study Report for a new grade-separated interchange which examined many structure types, including a pre-cast, prestressed concrete slab alternative.

 

Back to Project Study Reports

Traffic Engineering | Project Study Reports | Civil Design | Bridge Design | Site & Land Development
Construction Management
© 2010 MRO Engineers. All rights reserved.