Donner Summit Bridge Seismic Retrofit
Nevada County, CA

Provided construction management and inspection services, and materials testing for the rehabilitation and seismic retrofit of this historic bridge.  This open spandrel arch bridge, which is 257 feet long and 27 feet wide, has a 110-foot-long arch span with a concrete baluster railing.

 

Back to Construction Management

Traffic Engineering | Project Study Reports | Civil Design | Bridge Design | Site & Land Development
Construction Management
© 2010 MRO Engineers. All rights reserved.