Capay Bridge Replacement
Yolo County, CA

Complete PS&E package for this HBRR- and FEMA-funded "Fast-Track" bridge replacement project. The new bridge is a 3-span, cast-in-place, post-tensioned concrete box girder, 444 feet long and 33 feet wide.

 

Back to Bridge Design

Traffic Engineering | Project Study Reports | Civil Design | Bridge Design | Site & Land Development
Construction Management
© 2010 MRO Engineers. All rights reserved.